Anti-tempering device explosion-proof membrane replacement safety technical measures

Anti-tempering device explosion-proof membrane replacement safety technical measures

1. Before the construction, the dispatching room and the ventilation area must be approved. The ventilation area should send the full-time gas inspector to check the gas on site. The safety supervision department sends a full-time security inspector to supervise the safety on site. The construction person in charge should carry the gas portable instrument; all the construction personnel must Learn measures and sign.

2. The tools and materials used must be prepared before construction; care should be taken during handling and barbaric loading and unloading is prohibited.

3. The construction personnel should be certified to work and operate according to the chapter; remove the explosion-proof device.

4. The pump station attendant calls the dispatching room by telephone at the work place, and stops the pump emptying sequence:

(1) Press the stop button, stop; report to the dispatch room;

(2) The dispatching room arranges the gas drainage team to disconnect the underground drainage pipe.

(3) The dispatching room informs the gas pumping station that the underground has been disconnected;

(4) The gas drainage pump station emptying valve is opened, and the pipeline gas is drained;

(5) After the shutdown, the inspector shall check that the gas concentration in the gas and air in the pipeline shall not exceed 0.5%. When the inspection of the inspector proves that there is no gas accumulation in the roof section within 20 meters near the working site, confirm the safety and inform the on-site security inspector that it can work. .

(6) Hang up the “Someone is working, no power transmission” card on the operating handle.

5. It is strictly forbidden to carry out maintenance work on live materials and equipment.

6. There is water source at the construction site, and a special person must be responsible for sprinkling water during the whole construction process, and at least 2 good fire extinguishers are available.

7. Construction workers must step on a dry place to operate.

8. The construction is completed; report to the dispatching room, arrange the gas drainage team to resume the pumping pipeline; receive the call from the dispatching room, the underground has been restored, and the operation command can be released after the operation command is resumed; the power transmission is resumed, and the supervisor of the Ministry of Electrical and Mechanical Engineering agrees to test the pumping. Put the pump and observe for half an hour.

Identification of risk factors:

1. Before the construction, check the gas concentration to reach the standard before construction.

3. When the pump is stopped, the power-off sign is not hung, causing the person to operate the electric shock by mistake.

Plastic Apron

HDPE or LDPE Plastic Apron is commonly used in Kitchen, Bakery, Food processing, Supermarket, Medical Examination, DIY, Hotel, Restaurant, Beauty Salon, Haircut, Hair Dyeing, Hospital Lab, retail store, shopping mall, grocery stores, daily household etc.
Size: Various sizes according to the customers' requirement
Color: Transparent or colorful
Features: Disposal, Single-use, Waterproof, Food Grade material, Non-toxic
Surface Dealing:Plain or embossed
Printing: Customized


Plastic Apron

PVC Apron, Plastic Aprons, Disposable Plastic Aprons, Kids Disposable Aprons, Disposable PVC Aprons, Disposable Aprons

BILLION PLASTIC MANUFACTURING CO.,LTD, JIANGMEN , https://www.billion-plastics.com