Scania Head Gasket usually have three types: Single cylider, two cylinders and three cylinders. Most of them are metal and rubber compound material. These gasket have a big market share on Europ, Middle East and South America market.
Scania products are sold to more than 100 countries and regions in the worlds, is one of the world's leading manufacturers in heavy duty trucks and buses,With it's technology leading modular system, Scania has become the most profitable company in commercial automotive industry.
Scania Head Gasket,Scania Engine Gaskets,Scania D8 / D9 / D11 / DS11 / D12 / D13 / D14 Head Gasket, Scania Metal Head Gasket, Scania Metal and Rubber Compound Gasket NINGBO BEILUN QIANYI SEALING CO.,LTD. , https://www.hapgasket.com
Project Description: The project is located in Jinlong Garden, Hebin East Road, Yunfu City. The project mainly constructs the residential building of Block E of Yalong Court, Jinlong. The project covers an area of ​​4,200 square meters, covers an area of ​​1,080 square meters, and has 12 floors, a total construction area of ​​16,400 square meters, and a green area of ​​33%. The total investment of the project is 16 million yuan, of which the environmental protection investment is 1 million yuan.
Construction Unit: Yunfu Zhongnan Real Estate Development Co., Ltd. Postal address: 31 Yuhuang Road, Yuncheng City Zip code: 527300
Telephone design unit: Yunfu City Environmental Science Research Institute (EIA)
Zip code: No. 8 Tianzhu Road, Yunfu City Zip Code: 527300
phone
HAP gasket produce Scania engine gaskets, Popular engine including: D8, D9, D11, D12, D13, D14...
Brife introduce of Scania:
Scania is one of Sweden's truck and bus manufacturers,was founded in 1891 in the town of Malmo in south of Sweden. Headquarter is locaked in Sodertalje, Currently, Besides Sweden Scania has production lines in Netherlands, Argentina and Brazil.
Jinlong Yajuyuan E Block Residential Building Project>
Project Name: Jinlong Yajuyuan E Block Residential Building Project Area: Guangdong Development Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Cranes, Excavators, Fire Fighting Facilities, Security Facilities, Water Supply and Drainage Facilities, Ventilation Facilities Lighting facilities. (for reference only)
Related Developments: Tower Crane Infrastructure Project