Alumina production (six)

Continued on the table

Daily dispatch system

Article 1 Dispatchers at all levels should frequently go deep into the production line and construction site to understand and master the production schedule and project quality, the safety situation of the main working place in the mine, often understand the

Mining development and environmental protection first

Xinhuanet Tibet Channel May 24th Recently, Tibet issued the "Emergency Notice of the General Office of the People's Government of the Tibet Autonomous Region on Strengthening the Environmental Protection Work in the Mineral Resources Exploration Stage" to inform the environmental .......

Slow closing check valve features and how it works

First, the 300X slow closing check valve features: 300X slow closing check valve is a hydraulic control system composed of the main valve, check valve, needle valve, ball valve, microfilter, pressure gauge together. By hydraulic automatic operation, can cause the main valve to get the best.......

TSC wins a marine crane and service contract

Recently, TSC Group announced that TSC has successfully obtained a marine crane and service contract from Yantai CIMC Raffles Offshore Engineering Co., Ltd., which will be used for the renovation of a 400-foot jack-up drilling platform of China Petrochemical Corporation (Sinopec). On the projec.......